Name: BICSI Data Center Design Consultant – DCDC
Exam Code: DCDC-002
Certification: DCDC Certification
Vendor: BICSI
Total Questions: 158
Last Updated: October 10, 2025
465 Satisfied Customers
Success is simply the result of the efforts you put into the preparation. We at Dumpsgroup wish to make that preparation a lot easier. The BICSI Data Center Design Consultant – DCDC DCDC-002 Practice Exam we offer is solely for best results. Our IT experts put in their blood and sweat into carefully selecting and compiling these unique Practice Questions. So, you can achieve your dreams of becoming a DCDC Certification professional. Now is the time to press that big buy button and take the first step to a better and brighter future.
Passing the BICSI DCDC-002 exam is simpler if you have globally valid resources and Dumpsgroup provides you just that. Millions of customers come to us daily, leaving the platform happy and satisfied. Because we aim to provide you with DCDC Certification Practice Questions aligned with the latest patterns of the BICSI Data Center Design Consultant – DCDC Exam. And not just that, our reliable customer services are 24 hours at your beck and call to support you in every way necessary. Order now to see the DCDC-002 Exam results you always desired.
You must have heard about candidates failing in a large quantity and perhaps tried yourself and fail to pass BICSI Data Center Design Consultant – DCDC. It is best to try Dumpsgroup’s DCDC-002 Practice Questions this time around. Dumpsgroup not only provides an authentic, valid, and accurate resource for your preparation. They simplified the training by dividing it into two different formats for ease and comfort. Now you can get the BICSI DCDC-002 in both PDF and Online Test Engine formats. Choose whichever or both to start your DCDC Certification certification exam preparation.
Furthermore, Dumpsgroup gives a hefty percentage off on these Spoto DCDC-002 Practice Exam by applying a simple discount code; when the actual price is already so cheap. The updates for the first three months, from the date of your purchase, are FREE. Our esteemed customers cannot stop singing praises of our BICSI DCDC-002 Practice Questions. That is because we offer only the questions with the highest possibility of appearing in the actual exam. Download the free demo and see for yourself.
We know you have been struggling to compete with your colleagues in your workplace. That is why we provide the DCDC-002 Practice Questions to let you gain the upper hand that you always wanted. These questions and answers are a thorough guide in a simple and exam-like format! That makes understanding and excelling in your field way lot easier. Our aim is not just to help to pass the DCDC Certification Exam but to make a BICSI professional out of you. For that purpose, our DCDC-002 Practice Exams are the best choice.
There are many resources available online for the preparation of the BICSI Data Center Design Consultant – DCDC Exam. But that does mean that all of them are reliable. When your future as a DCDC Certification certified is at risk, you have got to think twice while choosing BICSI DCDC-002 Practice Questions. Dumpsgroup is not only a verified source of training material but has been in this business for years. In those years, we researched on DCDC-002 Practice Exam and came up with the best solution. So, you can trust that we know what we are doing. Moreover, we have joined hands with BICSI experts and professionals who are exceptional in their skills. And these experts approved our DCDC-002 Practice Questions for BICSI Data Center Design Consultant – DCDC preparation.
A. 24"
B. 30"
C. 36"
D. 42"
ANSWER : C
A. Switching between multiple utility power sources
B. Switching between utility and generator power sources
C. Switching between different generator power sources
D. Switching between AC and DC power sources
ANSWER : B
A. Outside the Building, at a secure location.
B. Near the Main Entrance of Data Center
C. Inside Computer Room
D. Outside Computer room, either in Storage Rooms or Staging Areas located adjacent to Computer Room with Dedicated air Handling
E. None of these
ANSWER : D
A. 3"
B. 6"
C. 9"
D. 12"
ANSWER : B
A. 5 meters (16 feet)
B. 10 meters (33 feet)
C. 15 meters (49 feet)
D. 20 meters (66 feet)
ANSWER : D
A. 8 feet minimum
B. 9 feet minimum
C. 10 feet minimum
D. 11ft minimum
ANSWER : C
A. 4 feet wide and have clear overhead of 8 feet
B. 5 feet width with a height of 7feet.
C. 6feet width, width depends on the layout functionality.
D. None
E. All
ANSWER : A
A. -25°F to +125°F (-32°C to +52°C)
B. -30°F to +110°F (-34°C to +43°C)
C. -20°F/-28° C minimum and up to a maximum of104 ° Fahrenheit/40° Celsius
D. Up To140 Degrees Fahrenheit /60 Degrees Celsius
ANSWER : C
A. 6 inches
B. 7 inches
C. 8 inches
D. 9 inches
E. 10 inches
ANSWER : C
A. Ground bus, direct connections, bond to rack
B. Ground conductor, surge protection, equipment rack
C. Copper cable, conduit, flexible connector
D. AC power, DC power, Ethernet
ANSWER : A
A. Transforming voltage
B. Delivering power directly to the server racks
C. Transferring control between utility and generator
D. Managing cooling systems
ANSWER : C
A. enough to run 4 to 16 hours at full load
B. enough to run 24 to 36 hours at full load
C. enough to run 48-72 hours at full load
D. enough to run up-to a week at full load
ANSWER : C
A. 3"
B. 6"
C. 9"
D. 12"
ANSWER : D
A. Evaluate environmental factors
B. Identify potential vulnerabilities
C. Assess security controls and countermeasures
D. All of the above
ANSWER : D
A. Single bus has only one power source while dual bus has two independent power sources
B. Single bus is more reliable than dual bus
C. Dual bus is more cost-effective than single bus
D. Single bus is more flexible and adaptable to changing needs than dual bus
ANSWER : A
A. Do not exceed 20 racks in length and dead-end rows not to exceed ten racks long
B. Maximum twenty-five racks in each row only
C. Ten Racks in Length
D. None
E. All
ANSWER : A
A. provide backup power to IT equipment only
B. supply power to the restrooms during a utility outage
C. back up office lighting
D. all of the above
ANSWER : D
A. To determine their electrical, space, interface, and other facility requirements
B. As an alternative approach to save cost
C. To know about hardware requirement only
D. none of above
ANSWER : A
A. Category1
B. Category2
C. Category3
D. Category 4
ANSWER : B
What is the appropriate fire rating requirements for an ITE space?
A. 1/2 hour
B. 1 hour
C. 2 hours
D. 3 hours
ANSWER : B
A. Temperature-Humidity Index (THI)
B. Airflow Efficiency Ratio (AFER)
C. Power Usage Effectiveness (PUE)
D. Computational Fluid Dynamics (CFD) modeling
ANSWER : D
A. when the battery weight exceeds 500 pounds
B. When the ceiling suspended load capacity is below 20 pounds per square foot
C. when the potential for outgassing hydrogen exists
D. When corrosive fumes are detected in operation room
ANSWER : C
A. Single point ground
B. Multiple point ground
C. Distributed ground
D. None of the above
ANSWER : A
A. install in dedicated electrical rooms, or, locate outside the computer room with fire rated wall
B. install within the computer room space on raised floor
C. install within server racks
D. none of the above
ANSWER : A