C_TSCM42_67 SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Dumps

If you are looking for free C_TSCM42_67 dumps than here we have some sample question answers available. You can prepare from our SAP C_TSCM42_67 exam questions notes and prepare exam with this practice test. Check below our updated C_TSCM42_67 exam dumps.

DumpsGroup are top class study material providers and our inclusive range of C_TSCM42_67 Real exam questions would be your key to success in SAP SAP Certified Application Associate Certification Exam in just first attempt. We have an excellent material covering almost all the topics of SAP C_TSCM42_67 exam. You can get this material in SAP C_TSCM42_67 PDF and C_TSCM42_67 practice test engine formats designed similar to the Real Exam Questions. Free C_TSCM42_67 questions answers and free SAP C_TSCM42_67 study material is available here to get an idea about the quality and accuracy of our study material.


discount banner

Sample Question 4

Which of the following structural elements does a process order have? (Choose three.)

A. Item data
B. Parallel sequences
C. Relationships
D. Phases
E. Characteristic-based process instructions


Sample Question 5

Which of the following statements best defines SAP ERP?

A. SAP ERP is an application that supports all processes involving direct customer contact throughout the entire customer relationship life cycle.
B. SAP ERP is an application that a company can use to manage its business processes efficiently.
C. SAP ERP is a system in which advanced planning and optimization processes can be mapped.
D. SAP ERP is a system hardware that includes components such as Purchasing, Sales and Distribution, Materials Management, and Production.


Sample Question 6

Which activity can trigger an automatic availability check for the components of a production order?

A. Material staging
B. Order rescheduling
C. Order release
D. Goods receipt for a missing part


Sample Question 7

Which of the following statements about the planning functions available in SAP ECC is correct?

A. Master production scheduling (MPS) refers to preferred planning of important materials.
B. Material requirements planning (MRP) includes automatic capacity leveling.
C. Long-term planning (LTP) is a long-term form of forecast planning.
D. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.


Sample Question 8

The final assembly of a finished product should only be triggered when a customer order arrives.Which planning strategy for the finished product do you use?

A. Planning with make-to-stock (strategy 10)
B. Planning at the assembly level (strategy 70)
C. Planning without final assembly (strategy 50)
D. Planning with final assembly (strategy 40)


Sample Question 9

Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)

A. MPS items are planned in a standard MRP run.
B. The planning of MPS and non-MPS items is always carried out in one planning run.
C. Non-MPS items can be taken into consideration by an MPS run.
D. MPS items can be defined on plant level.
E. MPS items can be defined on MRP area level.


Sample Question 10

What is SAP Solution Manager?

A. A transaction in the SAP ECC system
B. A standalone system that communicates with other systems in a system landscape
C. An add-on industry solution
D. A managed system in a system landscape


Sample Question 11

For which of the following objects can you enter a confirmation? (Choose two)

A. Work Center
B. Production order operation
C. Production order
D. Trigger Point


Sample Question 12

What do you have to consider regarding consumption? (Choose two)

A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption is restructured with the planning run.
C. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
D. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.


Sample Question 13

What can you use to organize material staging for production orders? (Choose three)

A. Material documents
B. Transfer orders
C. KANBAN
D. Pull list
E. Logistics Information System (LIS)


Sample Question 14

Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.Which BOM item category must you set to fulfill this requirement?

A. D (document item)
B. E (external procurement)
C. M (phantom material)
D. N (non-stock item)


Sample Question 15

What data can be posted directly via the Plant Data Collection (PP-PDC) interface?

A. Goods receipts
B. Maintenance notifications
C. Confirmations
D. Goods issues


Sample Question 16

When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)

A. General values from work scheduling view in the material master
B. Standard value from operation in task list
C. User-defined field from operation in task list
D. General operation values in task list
E. General item values in bill of materials


Sample Question 17

With which functions of the process order can you fulfill the requirements of the Good Manufacturing Practices (GMP) standard? (Choose three.)

A. Material identification and reconciliation
B. Availability check
C. Batch record
D. Resource selection
E. Digital signature


Sample Question 18

What do you have to consider, when you use the ATP (Available To Promise) checks for material? (Choose two)

A. ATP checks can be carried out automatically when releasing a production order.
B. ATP checks are automatically performed during Material Requirements Planning (MRP) runs.
C. ATP checks are used to evaluate the free capacity on a certain work center.
D. ATP checks are mandatory for lead-time scheduling.
E. ATP checks can be adjusted to also consider future requirements and receipts.


Sample Question 19

You want to create a new material that - is kept in stock- is externally procured- is used as a component in the bills of material for various final products- must not be sold directlyWhich standard SAP material type do you use?

A. NLAG (non-stock material)
B. FERT (finished product)
C. ROH (raw material)
D. HAWA (trading good)



Exam Code: C_TSCM42_67
Exam Name: SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
Last Update: May 13, 2024
Questions: 106